Concrete and fibreglass pools, built for Toowoomba blocks
A family-owned pool builder for Toowoomba and the Darling Downs, with a husband and wife sales and installation team.
On a slope or black soil, concrete. On firm, level ground, fibreglass
Concrete vs fibreglass: which is better? We like both. In some situations one type will outperform the other, and what decides it is the slope of the land, the soil and whether a crane can reach. Concrete suits sloping land, reactive black soil, cut-and-fill sites and yards a crane cannot reach. Fibreglass is the most maintenance-free pool, the fastest to install, smooth on hands and feet, uses less chemicals and costs less. In looks there is no difference.
ConcreteA sloping block of reactive black soil
FibreglassFirm, level ground a crane can reach
Concrete, when you have
- Sloping land: no separate retaining wall needed.
- Cut and fill, where the soil is not fully compacted.
- No crane access past trees or power lines.
- Any shape: wet edges, islands, beaches, steps, ledges.
“We had options of concrete or fibre glass but after intensive research we ended up with a concrete pool.”
“The pool is of an exceptional quality and we have been blown away with the level of support and service following completion.”
Fibreglass, when you want
- The fastest install, if a shape and size from the range suits you.
- The most maintenance-free pool, using less chemicals.
- Very smooth on hands and feet, and less expensive.
- Toowoomba’s exclusive provider of the Freedom fibreglass range.
The rest of the backyard, by the same team
Our services run from soil testing, engineering and approvals to the fencing, paving, decks and planting, so the area is ready to enjoy when we leave.
Your allowance, and what happens either side of it
What are provisional sums and prime costs?
A provisional sum is an allowance for work that is hard to price until it happens, usually excavation: if rock, stumps, roots or hard ground push it over, we charge what it cost us, and if it comes in under, we refund the difference. A prime cost is an allowance for things you choose, such as tiles, pavers and fence styles: choose dearer and you pay the difference, cheaper and we refund it, less a handling charge written into the contract (usually 20%).
What’s included?
- Our own qualified, fully licensed building team
- Plans, standard lodgement and certification fees
- Excavation and cartage to the agreed allowance
- Temporary fence hire, four weeks
- Standard engineering for M-class sites
- Engineer supervision of the steel (concrete)
- 50 mm pipework and two returns
- 400 mm large-format paved coping
- Davey or Zodiac filter, pump and chlorinator
- Seven-piece cleaning kit
- Water to fill the pool (fibreglass)
- $10,000,000 public liability insurance
- Pool and site cleaned on completion
What’s not included?
Electrical work, which must be done by a licensed electrician; excavation beyond the allowance, charged at cost with invoices on request; tip fees, only if no free tip site will take the soil; and relocating or repairing services or landscaping unless quoted. If it is not written on your estimate or contract, it is not included.
Tell David and Carol about your block
Slope, soil report, pool type: whatever you know so far. The first consult and quote are free.
What happens after I call?
We visit the site and talk through where the pool will go: sun, underground services, slope, overhead power lines, trees and access for heavy vehicles. You get a detailed estimate, refine it, then sign a contract. We prepare the engineering and plans and lodge the building application; once it is approved, construction starts. At handover we show you how to get the most out of the pool and how to look after it.
Or call 07 4636 2334
Mobile 0438 366 161
7 Hancock Street, Toowoomba City
